Water main installation in Milton results in extended road closure

By

Published December 3, 2021 at 1:37 pm

A water main installation in Milton has resulted in an extended road closure.

Residents are advised that the south side of the intersection at Fourth Line between Louis St Laurent Ave. and Britannia Rd. is closed.

The closure, which began on Monday, Nov. 28, was expected to last only until Dec. 4.

However, it has now been extended until Tuesday, Dec. 7.

According to the Town, during the closure, access for homeowners located between Britannia Rd. and access to Halton Region Booster Station will be maintained.

Traffic will be detoured via James Snow Pkwy and Louis St Laurent Ave.

insauga's Editorial Standards and Policies advertising