Two areas of Burlington hit with power outages

By

Published November 16, 2020 at 11:15 am

Power outages in two Burlington communities are expected to last until late this afternoon (Nov. 16).

In the Nelson Park area, Burlington Hydro crews are on the scene to repair damage caused by a line brought down by a broken tree limb.

In the opposite end of town, in the Derry Rd./Milburough Line area, a Hydro One equipment issue has caused the outage.

Both areas are expected to be without power until 4 p.m.

insauga's Editorial Standards and Policies advertising